Municipality in São Paulo
Bofete (SP)
- Intermediate region
- Bauru
- Immediate region
- Botucatu
- IBGE code
- 3506904
Not your municipality? Change it
- Accessible methane · N4
- 3.2 millionNm³ CH₄ per year307 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 341stof 645 municipalities in São Paulo
- Mobilisable · N3
- 3.6 millionNm³ CH₄ per year90% reaches the accessible level
- Main sector
- Livestock95% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Agricultural68.3K · 2%
- Corn52K
- Soybean14.8K
- Coffee1.53K
Livestock3.05M · 95%
- Poultry3.04M
- Cattle9.57K
Urban85K · 3%
- OFMSW (organics)79.2K
- Urban pruning5.79K
No accessible methane: Sugarcane, Citrus, Swine, and WWTP sludge.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N33.56M
Existing uses taken out. · range 1.26M to 9.91M
- Accessible · N43.21M
After storage and logistics to a viable plant. · range 252K to 9.4M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Bofete, in Nm³ CH₄ per year.
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Bofete (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/bofete-sp. Accessed: October 27, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)