Municipality in São Paulo
Cajamar (SP)
- Intermediate region
- São Paulo
- Immediate region
- São Paulo
- IBGE code
- 3509205
Not your municipality? Change it
- Accessible methane · N4
- 140.4 thousandNm³ CH₄ per year1.51 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 556thof 645 municipalities in São Paulo
- Mobilisable · N3
- 198.3 thousandNm³ CH₄ per year71% reaches the accessible level
- Main sector
- Urban99% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Livestock1.98K · 1%
- Poultry1.98K
Urban138K · 99%
- OFMSW (organics)101K
- Urban pruning37.1K
No accessible methane: Sugarcane, Soybean, Corn, Coffee, Citrus, Cattle, Swine, and WWTP sludge.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N3198K
Existing uses taken out. · range 4.19K to 1.19M
- Accessible · N4140K
After storage and logistics to a viable plant. · range 739 to 1.1M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Cajamar, in Nm³ CH₄ per year.
- São Paulo50.9M
- Jundiaí4.02M
- Santana de Parnaíba537K
- Caieiras414K
- Franco da Rocha272K
- Cajamar · this municipality140K
- Pirapora do Bom Jesus4.11K
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Cajamar (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/cajamar-sp. Accessed: October 27, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)