- Accessible methane · N4
- 3.6 millionNm³ CH₄ per year869 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 317thof 645 municipalities in São Pauloin the state's top 50% by potential
- Mobilisable · N3
- 4.7 millionNm³ CH₄ per year77% reaches the accessible level
- Main sector
- Livestock58% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Agricultural1.53M · 42%
- Sugarcane1.5M
- Soybean19.6K
- Corn3.07K
- Coffee1.33K
Livestock2.1M · 58%
- Poultry2.03M
- Cattle70.3K
- Swine1.6K
Urban22K · 0.6%
- OFMSW (organics)19.6K
- Urban pruning2.32K
No accessible methane: Citrus and WWTP sludge.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N34.72M
Existing uses taken out. · range 1.88M to 11.8M
- Accessible · N43.65M
After storage and logistics to a viable plant. · range 498K to 11.1M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Corumbataí, in Nm³ CH₄ per year.
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Corumbataí (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/corumbatai-sp. Accessed: October 30, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)