- Accessible methane · N4
- 3.2 millionNm³ CH₄ per year519 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 342ndof 645 municipalities in São Paulo
- Mobilisable · N3
- 5 millionNm³ CH₄ per year64% reaches the accessible level
- Main sector
- Livestock96% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Agricultural85.4K · 3%
- Corn83K
- Sugarcane1.74K
- Coffee698
Livestock3.07M · 96%
- Poultry3.03M
- Cattle34.9K
- Swine862
Urban30.9K · 1%
- OFMSW (organics)27.5K
- Urban pruning3.4K
No accessible methane: Soybean, Citrus, and WWTP sludge.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N35.01M
Existing uses taken out. · range 1.71M to 12.7M
- Accessible · N43.18M
After storage and logistics to a viable plant. · range 559K to 9.58M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Iacri, in Nm³ CH₄ per year.
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Iacri (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/iacri-sp. Accessed: October 29, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)