Municipality in São Paulo
Mauá (SP)
- Intermediate region
- São Paulo
- Immediate region
- São Paulo
- IBGE code
- 3529401
Not your municipality? Change it
- Accessible methane · N4
- 1.7 millionNm³ CH₄ per year4.01 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 423rdof 645 municipalities in São Paulo
- Mobilisable · N3
- 1.8 millionNm³ CH₄ per year92% reaches the accessible level
- Main sector
- Urban100% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Livestock818 · 0%
- Swine329
- Cattle314
- Poultry174
Urban1.68M · 100%
- OFMSW (organics)769K
- WWTP sludge677K
- Urban pruning232K
No accessible methane: Sugarcane, Soybean, Corn, Coffee, and Citrus.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N31.83M
Existing uses taken out. · range 145K to 8.6M
- Accessible · N41.68M
After storage and logistics to a viable plant. · range 66K to 8.6M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Mauá, in Nm³ CH₄ per year.
- São Paulo50.9M
- Suzano3.27M
- Santo André2.33M
- Mauá · this municipality1.68M
- Ferraz de Vasconcelos641K
- Ribeirão Pires405K
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Mauá (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/maua-sp. Accessed: October 26, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)