Municipality in São Paulo
Morungaba (SP)
- Intermediate region
- Campinas
- Immediate region
- Jundiaí
- IBGE code
- 3532009
Not your municipality? Change it
- Accessible methane · N4
- 2.5 millionNm³ CH₄ per year181 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 377thof 645 municipalities in São Paulo
- Mobilisable · N3
- 2.7 millionNm³ CH₄ per year93% reaches the accessible level
- Main sector
- Livestock80% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Agricultural411K · 17%
- Corn378K
- Soybean24.3K
- Coffee8.49K
Livestock1.99M · 80%
- Poultry1.96M
- Cattle25.1K
Urban88K · 4%
- OFMSW (organics)80.4K
- Urban pruning7.6K
No accessible methane: Sugarcane, Citrus, Swine, and WWTP sludge.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N32.68M
Existing uses taken out. · range 905K to 6.67M
- Accessible · N42.49M
After storage and logistics to a viable plant. · range 743K to 6.47M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Morungaba, in Nm³ CH₄ per year.
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Morungaba (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/morungaba-sp. Accessed: October 22, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)