- Accessible methane · N4
- 299.2 thousandNm³ CH₄ per year116 Nm³ CH₄ per inhabitant per year
- Rank in the state
- 534thof 645 municipalities in São Paulo
- Mobilisable · N3
- 455.9 thousandNm³ CH₄ per year66% reaches the accessible level
- Main sector
- Agricultural99% of the accessible methane
Where the methane comes from
Accessible methane (N4) by sector and residue, in Nm³ CH₄ per year.
Agricultural296K · 99%
- Sugarcane296K
- Corn124
Livestock458 · 0.2%
- Poultry458
Urban2.35K · 0.8%
- OFMSW (organics)1.97K
- Urban pruning384
No accessible methane: Soybean, Coffee, Citrus, Cattle, Swine, and WWTP sludge.
Method levels
Bar: central value. Line: the method's range, minimum to maximum.
- Mobilisable · N3456K
Existing uses taken out. · range 196K to 1.38M
- Accessible · N4299K
After storage and logistics to a viable plant. · range 56.8K to 1.3M
The earlier levels (theoretical and available) appear once the method paper is published.
Nearby infrastructure
Distances to gas pipelines, transmission lines, substations and plants.
Neighbouring municipalities
Accessible methane (N4) of the municipalities bordering Pracinha, in Nm³ CH₄ per year.
- Martinópolis20.2M
- Lucélia17.1M
- Inúbia Paulista1.21M
- Sagres405K
- Mariápolis396K
- Pracinha · this municipality299K
Share
How to cite this page
CP2b/NIPE-UNICAMP. PILAR-2b: profile of the municipality of Pracinha (SP). Available at: https://cp2b.unicamp.br/pilar2b/en/municipalities/pracinha-sp. Accessed: October 28, 2026.
Downloads are paused during the beta while the database is validated. This municipality's workbook and report return with the other files.
Notes and limitationsOpen
- The potential is a model estimate, built from official data on crop production, herds, population and sanitation. It is not a field measurement.
- The values are methane (CH₄). Raw biogas also contains other gases, so the same potential as biogas is a larger volume.
- The accessible level (N4) accounts for logistics to a plant of viable scale. A municipality can have mobilisable potential (N3) and zero accessible potential when no plant reaches that scale.
- The method covers the municipalities of São Paulo. Those in other states show as no CP2b data.
If a figure for this municipality does not match what you know, tell the team. Report an error (CP2b website)
Data: CP2b method, CP2b v5.1 (24/09/2026)