Skip to main content

Mandate panel

The biomethane mandate, month by month

The Fuel of the Future law obliges natural gas producers and importers to cut the emissions of the gas they sell, with biomethane proven by CGOB certificates. CNPE sets each year's target; ANP publishes each month's production. Here they are side by side.

Figures checked on Oct 20, 2026. Beside each figure, a button opens its source directly, coloured by the kind of source; the "calculation" button shows the arithmetic. Where to check the latest data

Kinds of source:OfficialDataStudyCompanyPressEstimatecalculation

2026 target
505 thousandm³/day0.5% emissions reductionCNPE 4/2026
Brazil produces
443 thousandm³/dayApr 2026 · 88% of the 2026 targetANP, painel do biometanocalculation
São Paulo produces
118 thousandm³/dayApr 2026 · 27% of national productionANP, painel do biometano
CGOB issued
No registryNone issued as of the last check: issuance waits on the ANP system built with Serpro. B3, ACX and Instituto Totum are already accredited to register them.Res. ANP 996/2026Exame, set/2026eixos, out/2026

The target path

Biomethane required each year, in m³/day, and national production in Apr 2026. ≈: no published volume, scaled from the latest proposal.ANP, painel do biometano

  • Current production443 thousand
  • 2026 · 0.5%505 thousand
  • 2027 · 1%995 thousand
  • 2028 · 3%≈ 2.99 million
  • 2029 · 4%≈ 3.98 million
  • 2030 · 5%≈ 4.98 million

How we calculate

  • Production: the month's m³ in the ANP base, all products, ÷ days in the month.
  • Coverage: national production in Apr 2026 (443 thousand m³/day) ÷ the 2026 daily target (505 thousand m³/day) = 88%.
  • Targets without a published volume (≈): 995 thousand m³/day for 2027 ÷ 1% × each year's percentage.
Sources for this card (8) · checked on Oct 20, 2026
Law, targets and CGOB rules

Biomethane production (ANP)

Daily average of each month, all products. The dashed line is the 2026 target.ANP, painel do biometanocalculation

BrazilSão Paulo
Biomethane production (ANP)
MonthBrazilSão Paulo
May 2024198 thousand20.9 thousand
Jun 2024224 thousand12 thousand
Jul 2024214 thousand13.9 thousand
Aug 2024210 thousand18.7 thousand
Sep 2024196 thousand23.6 thousand
Oct 2024243 thousand51.2 thousand
Nov 2024247 thousand54.9 thousand
Dec 2024234 thousand65 thousand
Jan 2025243 thousand62.1 thousand
Feb 2025230 thousand44 thousand
Mar 2025303 thousand118 thousand
Apr 2025273 thousand82 thousand
May 2025309 thousand121 thousand
Jun 2025324 thousand137 thousand
Jul 2025358 thousand159 thousand
Aug 2025376 thousand158 thousand
Sep 2025343 thousand112 thousand
Oct 2025384 thousand148 thousand
Nov 2025408 thousand139 thousand
Dec 2025379 thousand117 thousand
Jan 2026381 thousand96.1 thousand
Feb 2026406 thousand117 thousand
Mar 2026400 thousand90.9 thousand
Apr 2026443 thousand118 thousand
Sources for this card (1) · checked on Oct 20, 2026
Monthly production by state and capacity by plant

Is it worth swapping the engine for an upgrader?

Per m³ of methane: what the environmental attribute (CGOB or equivalent) must be worth for selling biomethane to pay as much as burning the biogas for power, at each power price.

Inputs of this card

Molecule (Green Captive Market, before PIS/Cofins)
R$2.25/m³Arsesp, Del. 1.846/2026Comgás, tarifas
Attribute (Green Captive Market, before PIS/Cofins)
R$1.40/m³Arsesp, Del. 1.846/2026Agência iNFRA, set/2026Argus, jan/2026
Upgrading (25 €/MWh at R$5.80/€)
R$1.44/m³PMC9821904, 2023BCB, PTAX
PLD SE/CO (Apr–Jul/2026, CCEE)
R$135 to R$225/MWhCCEE, painel de preçosCCEE, dados abertosCCEE, InfoPLD jul/2026
Self-consumed power
R$450/MWhSource (Estimate): Energia autoconsumida a R$ 450/MWh: perto da tarifa que a usina deixa de pagar — PILAR-2b, Oct 2026.
Methane LHV (0 °C)
9.94 kWh/m³NIST WebBook, metano
Engine electrical efficiency
38%Source (Estimate): Rendimento elétrico de 38 % para o motor-gerador a biogás — PILAR-2b, Oct 2026. Motores grandes chegam a 40–45 %; motores pequenos ou adaptados ficam bem abaixo.Caterpillar, CG170B-16
Methane in biogas
55%–65%Embrapa, 2014
Biogas produced in SP
4.9 million m³/dayCIBiogás, Panorama 2025

With power below R$214/MWh, biomethane already pays more with no attribute at all.calculation

Even when the plant uses its own power, the break-even attribute stays below what the Green Captive Market pays for the attribute.Arsesp, Del. 1.846/2026Agência iNFRA, set/2026Argus, jan/2026calculation

São Paulo already produces biogas with about 2.94 million m³/day of methane, most of it burned for power: 3× the 2027 target.CIBiogás, Panorama 2025Embrapa, 2014Portaria MME 942/2026calculation

How we calculate

  • Power route, per m³ of CH₄: 9.94 kWh × 38% × power price. At R$450/MWh: R$1.70/m³.
  • Upgrading: 25 €/MWh × R$5.80/€ × 9.94 kWh ÷ 1,000 = R$1.44/m³.
  • Break-even attribute = power route − (molecule − upgrading). At R$450/MWh: R$1.70 − (R$2.25 − R$1.44) = R$0.89/m³. Negative: no attribute needed.
  • Threshold: (R$2.25 − R$1.44) ÷ (9.94 kWh × 38%) × 1,000 = R$214/MWh.
  • SP methane: 4.9 million m³/day of biogas × 60% CH₄ (middle of the range) = 2.94 million m³/day; ÷ the 2027 target (995 thousand m³/day) = 3×.

Molecule and attribute are the opening prices Arsesp set for the Comgás Green Captive Market, before PIS/Cofins (Sep/2026). The CGOB has no price yet: suppliers ask for a R$ 1/m³ floor, and part of the market expects less. Grid connection (pipeline or truck) and the engine already paid for are left out.

Sources for this card (15) · checked on Oct 20, 2026
Molecule
Environmental attribute
Upgrading cost
Exchange rate (euro)
Power price (spot)
Self-consumed power
  • EstimateEnergia autoconsumida a R$ 450/MWh: perto da tarifa que a usina deixa de pagar · PILAR-2b · Oct 2026
Methane LHV
Engine electrical efficiency
Methane in biogas

What adds up in the revenue of one m³ of biomethane

Projects and lenders often add revenues that do not add up. Each line says whether it counts alongside the others, and why.

Possible sum per m³: up to R$3.82 (molecule and attribute at Green Captive Market prices, and the CBIO ceiling). The other lines have no public price or are not revenue.calculation

Adds up

MoleculeR$2.25/m³
The gas without its environmental attribute, at the price Arsesp set for the biomethane molecule in the Comgás Green Captive Market.Arsesp, Del. 1.846/2026Comgás, tarifas
Biogenic CO₂1.0–1.5 kg/m³
A physical co-product of upgrading; in an engine it leaves diluted in the exhaust. No public price in SP: it needs a buyer nearby.Res. ANP 906/2022Embrapa, 2014calculation
Digestate from urban waste6% of the digestate value
The nutrient that goes to landfill today: the only one that is new revenue.Source (Estimate): Nutrientes do digestato de SP por destino atual do resíduo (protótipo, cenário Real) — PILAR-2b, Oct 2026.

Sold only once

CGOB, for the mandate1 CGOB = 100 m³ · R$140 at the Green Captive price
The certificate natural gas producers and importers buy to meet the target. No public price yet: suppliers ask for a R$ 1/m³ floor.Res. ANP 995/2026Arsesp, Del. 1.846/2026Agência iNFRA, set/2026Argus, jan/2026calculation
Attribute in the Green Captive MarketR$1.40/m³
Goes to the Comgás customer who buys the biomethane: once sold to them, the attribute cannot be sold again as a CGOB. Opening price set by Arsesp, before PIS/Cofins.Arsesp, Del. 1.846/2026Agência iNFRA, set/2026Argus, jan/2026
Voluntary certificate (GAS-REC, I-REC)
To back a CGOB with a 2026 invoice, ANP requires cancelling the voluntary certificate for the same volume.Res. ANP 996/2026Tauil & Chequer, mar/2026

Adds up, with a caveat

CBIO (RenovaBio)up to R$0.10–R$0.17/m³
Ceiling of 0.0031 CBIO per m³ (biomethane with no emissions at all), at the Jan–Feb 2026 price and the 2025 average; in March 2026 the CBIO reached R$ 19.90. ANP allows a CBIO and a CGOB from the same invoice, with the CGOB flagging the CBIO; part of the market sees double counting in this.ANP, CBIOB3, ICBIOItaú BBA, 2026ANP, RenovaCalcPereira et al., 2025Res. ANP 996/2026Tauil & Chequer, mar/2026Brasil Energia, jul/2025calculation

Do not add

Voluntary carbon credit
For the methane avoided (lagoon, landfill). Do not add it without checking what the methodology credits: if it also credits the fossil fuel displaced, it overlaps the CBIO and the attribute. The Climate module's reduction is not a credit.
Digestate from streams already returned to the soil81% of the digestate value
Vinasse, filter cake, manure: the digester keeps the nutrient, it does not create it.Source (Estimate): Nutrientes do digestato de SP por destino atual do resíduo (protótipo, cenário Real) — PILAR-2b, Oct 2026.
Nutrient in the straw removed13% of the digestate value
A cost, not revenue: avoided only if the digestate goes back to the cane field.Source (Estimate): Nutrientes do digestato de SP por destino atual do resíduo (protótipo, cenário Real) — PILAR-2b, Oct 2026.
Power from the same biogas
Either power or biomethane: see the route switch above.

How we calculate

  • CBIO ceiling: 35.8 MJ/m³ × 86.7 g CO₂e/MJ ÷ 1,000,000 = 0.0031 CBIO/m³ (zero-emission biomethane); × R$31.40 to R$54.70 per CBIO = R$0.10 to R$0.17/m³.
  • CO₂ per m³ of biomethane: (1 − CH₄) ÷ CH₄ × 1.84 kg/m³, with CH₄ from 65% to 55% = 0.99 to 1.51 kg.
  • CGOB: 1 certificate = 100 m³; at the Green Captive attribute price (R$1.40/m³), R$140 per CGOB.
  • Possible sum: R$2.25 + R$1.40 + R$0.17 = R$3.82/m³.

Shares of the nutrient value of SP digestate, by where the residue goes today (PILAR-2b prototype, Real scenario). Screening values: molecule and attribute are the Green Captive Market opening prices, the CGOB has no price yet, and the CBIO price moved a lot in 2026.

Sources for this card (11) · checked on Oct 20, 2026
CBIO fossil reference
CBIO: definition and price
1 CGOB = 100 m³
CGOB rule with CBIO
Critique of double issuance
Reference conditions of the m³ (CO₂ density)
Digestate
  • EstimateNutrientes do digestato de SP por destino atual do resíduo (protótipo, cenário Real) · PILAR-2b · Oct 2026

Biogenic CO₂: how much upgrading separates, and who would buy it

The CO₂ that comes out of biogas upgrading at each São Paulo biomethane plant (ANP, Apr 2026), against the market it would be sold into.

By plant (t of CO₂ per day)ANP, painel do biometanocalculation
PlantTodayAt capacity
Essencis Biometano S.A.Caieiras41–5390–116
Raízen-Geo Biogás Costa Pinto Ltda.Piracicaba20–26148–190
Metagás Biogás e Energia S.A.Sao Paulo18–2339–50
Cocal Energia S.A.Narandiba12–1633–43
Engep Ambiental LtdaJambeiro11–1454–70
Cri Geo Biogas S.A.Elias Fausto8–1039–50
Biometano Verde Paulinia S.A.Paulinia—155–199
Bioenergia Santa Cruz Ltda.Americo Brasiliense—98–126
Cocal Energia Ppt Participações LtdaParaguacu Paulista—82–105

SP's plants already separate about 8% of all the CO₂ Brazil consumes. All SP biogas, upgraded, would give 2–2.5 times that market. Some already sell it: Cocal separates 48 t/day upgrading biogas in Narandiba (SP), and Gás Verde about 100 t/day in Rio de Janeiro.calculationCocalGás VerdeAgFeed, out/2023eixos, 2022

And ethanol has far more: EPE puts the biogenic CO₂ available in that sector at 27M t/yr, almost pure from fermentation, against 490K t/yr in biogas.EPE, 2025eixos, 2025

Selling the CO₂ to drinks or food returns it to the air: that is not a removal. Only permanent geological storage can count as one. Law 14,993/2024 and Decree 13,095/2026 put storage permits with ANP and allow it to count in the SBCE (Law 15,042/2024), but ANP's rules and the SBCE methodologies are still being drafted.Lei 15.042/2024Lei 14.993/2024Decreto 13.095/2026ANP, CCS

How we calculate

  • Per plant: biogas processed in the month (ANP) × 35% to 45% CO₂ × 1.84 kg/m³ ÷ 1,000 = t/day; × 365 = t/year. At capacity, the same with the plant's biogas capacity.
  • All SP biogas: 4.9 million m³/day, the same arithmetic.
  • Market: 1,600 t/day × 365 = 580K t/yr.
  • SP share: middle of today's range (40K–52K t/yr) ÷ market = 8%.

Biogas at 35–45 % CO₂; CO₂ at 1.84 kg/m³ (20 °C and 1 atm, the ANP reference). Brazil's CO₂ market has no official figure: 1,600 t/day is a 2023 estimate, and a 2022 one gives 1,100. The buyers (drinks, food, greenhouses, e-methanol) are not on the map yet: that layer needs the RAIS establishment register.

Sources for this card (11) · checked on Oct 20, 2026
Size of the CO₂ market

Where to check

The pages where this panel's figures are published and updated. The cards above give the date of each source.

Official and Data: readers can check the source itself. Study and Company: figures from whoever published them. Press: check the original before quoting. Estimate: a PILAR-2b assumption with no public source.

How to cite this panel

CP2b/NIPE-UNICAMP. PILAR-2b: biomethane mandate panel, sources checked on Oct 20, 2026. Available at: https://cp2b.unicamp.br/pilar2b/en/mandate. Accessed: November 27, 2026.

When you use a figure, also cite its original source: the button beside it. Other citation formats

Limits

  • The target covers the year; production is one month. A month below the line is not non-compliance: the target is settled over the year, with CGOB, under ANP Resolution 995/2026.
  • The 2028–2030 targets are indicative and have no published volume yet: the panel scales the 2027 proposal by the percentage, as an order of magnitude only.
  • ANP production may be revised after publication, and the latest month is the most recent the platform has ingested.
  • The mandate is national and CGOB is tradable: São Paulo need not cover the target alone. SP's share measures weight, not a state obligation.